After nine years of suspension, well EE1HR-80 at the Majid Field has returned to production through a joint operation by Camco, an Edgo company, and Arabian Gulf Oil Company (AGOCO).
Camco’s directional drilling, geosteering, and reservoir navigation capabilities were deployed alongside AGOCO’s reservoir knowledge to guide the well through the target interval and maximize exposure to the pay zone during re-entry.
Initial testing recorded 5,322 barrels of oil per day (BOPD) under natural flow, with zero water cut. Associated gas production reached 3.19 million standard cubic feet per day (MMSCFD), while the produced oil measured 39° API.
Restoring production from EE1HR-80 after nine years marks a significant result for the AGOCO and Camco teams. The operation demonstrates how reservoir knowledge and precise well placement, supported by effective field execution, can bring a suspended well back into production.
The project builds on Camco’s work with the National Oil Corporation and its operating companies in Libya, applying its drilling and well services capabilities to support the development and production of the country’s oilfields.
